Street Maintenance

Pidgeon crossing the street

The Public Works Department recently presented streets selected for the Fiscal Year 2021-22 Levelup Program. With the budget Council approved in January as part of the Street Maintenance Program, we have identified a little over 20,000 linear feet of streets for the program. Transportation User Fee (TUF) Fund total this year for street repair funding will be approximately $225,000.

The Public Works Department selected the streets using the Pavement Condition Index (PCI) scores from street study conducted by Gorrondona & Associates in early 2020. The Levelup Program looks to improve streets by repairing parts of existing streets. Repairing means to bring localized areas of pavement failure to a drivable condition. The program is intended to improve streets for 1-3 years. 

Streets selected for the 2021-22 Levelup Program are:

  • Symes (San Gabriel to Potomac)
  • Mills Street
  • West 8th Street
  • Cecelia Street
  • George Street
  • Mills Street
  • Porter Street
  • West 3rd Street (Fowzer to Vance/Sloan to dead end)
  • Adams Street
  • Lizzie Street (4th to Cecelia)
  • Talbot Street
  • East 6th Street
  • West 9th Street
  • North Doak Street
  • West 7th Street
  • Old Georgetown Road
  • Vance Street
  • Wabash Street
  • East 10th Street
  • Gym Street
  • McLain Street (Fairgrounds to Victoria)
  • West 1st Street
  • West 5th Street (Doak to Victoria)
  • West 12th Street
  • Ferguson Street
  • West 6th Street
  • Fairgrounds Street
  • Forest Circle
  • Fowzer Streets
  • West MLK Blvd.
  • Old Coupland Road (first 1,445 feet)
  • Hackberry Street
  • Vance Street
  • North Lynn Street
  • Hood Street
Street Selections for 2021 Street Level Up Program