Parks Projects
Welcome to the Taylor Parks and Recreation Department's project hub, your one-stop destination for a glimpse into the exciting developments that are shaping our vibrant community. At the heart of our commitment to enhancing the quality of life for all residents and visitors is our dedication to the continual improvement and expansion of our parks, recreational facilities, and programs.
Here, we invite you to explore a dynamic showcase of our current and upcoming projects that promise to transform Taylor into an even more inviting and enjoyable place to live, work, and play.
Wellness/Recreation Center Feasibility Study
The need for an indoor recreation facility has been an identified community since 2004 within the parks and recreation master plan. In 2010, the City of Taylor pursued a bond election to construct a recreation facility which failed. The need for this type of facility was once again identified by the community during the 2016 Parks Master Plan development.
The purpose of the Feasibility Study is to understand the demographics of the community and their current participation in recreational activities, conduct stakeholder interviews and surveys, complete a needs assessment, develop preliminary cost estimates for construction and operation, recommend funding opportunities, and produce concept floorplans. The completion of the study will not guarantee the future construction of a wellness and recreation center but will simply provide the City necessary information and documentation to see if such a facility is needed and possible.
Estimated Timeline
- Requests for Qualifications (RFQ) opened March 2024
- RFQ awarded to Barker Rinker Seacat (BRS) Architecture in July 2024
- Anticipated project start of August 2024
- Study to take approximately 8 months with a possible completion date of April 2025
Related Documents
View Full Project Page Here
Doris Roznovak Aquatic Center Reconstruction
In an effort to revitalize the Doris Roznovak Aquatic Center, the City of Taylor Parks and Recreation Department will soon embark on a reconstruction project. Our City's pool has long been a place for residents of the Taylor community to gather and make memories with family and friends.
Estimated Timeline
- Construction began in January 2025
- Estimated completion in October 2025
- Scheduled reopening in May 2026
Related Documents
Recently Completed
Memorial Field Track Resurfacing
Upgrades to the Memorial Field Track will include resurfacing with new asphalt and rubber, striping, and additions of curb on the inside and outside perimeter.
Estimated Timeline
- Construction will begin October 21, 2024
- Completed in February 2025
This project was completed in February 2025
Bull Branch Park Playground
In early 2023, the Parks and Recreation Department in conjunction with the Public Works Department removed the previous playground from Bull Branch Park as it was deemed unsafe for use. Whirlix Design Incorporated was approved for replacement of the playground.
The new playground features:
- “Tree Tops” Concept
- Additional Swings
- Zip Line Feature
- Slides
- Vine Climber
This project has been completed. Parks and Recreation held a ribbon-cutting ceremony to commemorate and officially open the play ground on Wednesday, April 17, 2024.
Heritage Square Splash Pad
The Heritage Square Splashpad is currently undergoing some changes and our visitors can soon get back to enjoying cooling off during the hot summer days ahead of us.
Reconstruction has begun and there are some exciting changes and upgrades ahead. To help stabilize our shifting Blackland soil, the contractor will be injecting the soil with chemicals that will help with shifting - which means no more ponding around the splashpad making it safer for our visitors. The chemicals are safe, non-toxic, and water-soluble.
There will be 360-degree illuminating LED light fixtures and a new spray play splash deck that will be slip-resistant.
The deck and sidewalk around the splashpad will also be replaced to reduce trip hazards throughout the area.
This project has been completed and the splash pad reopened on June 6, 2024.
New Pickleball Court Addition
As of June 6th, construction has begun on the addition of three lit pickleball courts due south of the existing pickleball courts in Murphy Park. Due to the proximity to construction the existing pickleball courts will be closed for an estimated 3-4 weeks. The entire project is estimated to be completed in 6-7 weeks.
This project was completed in August 2024.
-